← Consulting School · Service Design Sprint · Facilitator Playbook

Project Rainbow
End-to-End Workshop Build

A fully populated run-of-show that takes a bespoke advisory capability and productizes it into a scalable, tiered service — one worked example carried from client pain point all the way through to future innovation.

⏱ 10:15 – 12:00 · 105 min 👥 8–12 participants · 2 facilitators 🎯 5 linked blocks 📦 Output: productized service blueprint

How to read this playbook

This is the workshop built out — not the agenda, but what the agenda produces when you actually run it. Each of the five blocks below is populated end to end: the facilitation flow (minute by minute), the framework filled in, and a worked output for Rainbow showing the kind of artifact the room should walk away with.

How this playbook uses "Rainbow"

Rainbow is the codename for taking a signature bespoke advisory capability and turning it into a productized, tiered, repeatable service. The agenda's own language — pain point → segmentation → productization → operational readiness → future innovation — is a classic service-productization sprint, and that is the spine of this playbook.

To make the method visible it is instantiated concretely as "Rainbow Readiness" — a diagnostic-led advisory for mid-market leaders (£50m–£500m revenue) about to commit to a major transformation, with no fast, reliable way to know whether their organization is actually ready to absorb it. Every worked box is illustrative and fully editable — re-skin it for the capability your workshop is productizing.

Run-of-show

A clean, non-overlapping timing, with facilitator ownership as placeholders to assign. Every workshop is different — set your own start time and block lengths below and the whole playbook (this table, the block headers, the header chip) re-times itself. Your timing is saved in this browser.

TimeBlockFocusLead
10:15–10:35
20 min
Defining the Client Pain PointEmpathy & value props[Lead A]
10:35–11:00
25 min
Persona & Worldview MappingMarket segmentation[Lead B]
11:00–11:20
20 min
Service ProductizationProduct roadmap[Lead A]
11:20–11:40
20 min
Operational Readiness & IntegrationScaling infrastructure[Lead B]
11:40–12:00
20 min
Pink Space IdeationFuture innovation[Both]

Note on "Pink Space": the house name for unconstrained, over-the-horizon ideation — the "what could this become in 3 years" space, cousin to blue-sky / white-space thinking.

The golden thread

The workshop only works if each block consumes the output of the last. Here's the chain of custody for a single insight as it travels the room:

  1. Pain point — "Leaders commit to transformation blind to whether their org can absorb it." → becomes the problem statement.
  2. Persona — We locate who feels that pain most acutely and can act on it: the newly-appointed COO/Transformation Director at a scaling mid-market firm. → becomes the target segment.
  3. Productization — We package the fix into a tiered offer that segment will actually buy: Diagnostic → Roadmap → Embedded. → becomes the product.
  4. Operational readiness — We pressure-test whether we can deliver it repeatably and at scale: tooling, talent model, unit economics. → becomes the delivery blueprint.
  5. Pink space — We ask what this becomes once it's real: data network effects, a benchmark index, a platform play. → becomes the innovation horizon.

Facilitator discipline: at every handoff, physically carry the previous block's headline output onto the next canvas. If a block can't name what it inherited, the thread is broken.

01
Empathy & Value Props

Defining the Client Pain Point

10:15–10:35 · 20 min

Objective

Leave with one sharp, evidence-anchored problem statement — the single pain Rainbow exists to kill — plus the value we create by killing it.

Output artifact

A completed Pain–Value canvas: 1 problem statement, 3 pains, 3 gains, 1 "if we're right…" hypothesis.

Facilitation flow

0–3 min · Frame
Lead A states the rule: no solutions yet. We are only allowed to talk about the client's world and what hurts in it.
3–10 min · Silent pain dump
Individually, everyone writes real observed client pains on stickies — one per sticky, phrased in the client's voice ("I keep…", "I can't…"). Aim for 5+ each.
10–15 min · Cluster & rank
Affinity-cluster on the wall. Dot-vote the cluster that is most frequent × painful × unserved.
15–20 min · Write the statement
Convert the winning cluster into one problem statement using the template, and name the value of solving it.

Problem-statement template

"[Persona] trying to [job-to-be-done] is blocked by [pain], which today they work around by [costly workaround]. It matters because [consequence]."

Pain–Value canvas — Rainbow Readiness

Problem statement: A newly-appointed transformation owner trying to de-risk a board-mandated transformation is blocked by having no fast, credible read on whether the organization can actually absorb the change, which today they work around by commissioning a slow, bespoke, six-figure assessment or simply pressing "go" and hoping. It matters because ~70% of large transformations under-deliver, and the failure is visible 18 months too late.

Top 3 client painsTop 3 gains if solved
"I'm accountable for a number I can't yet defend."Board-ready confidence in weeks, not quarters.
"Every readiness review is bespoke, slow and expensive."A repeatable, benchmarked answer at a fraction of the cost.
"I find out we weren't ready only after we've spent the money."Early warning — fix the gaps before they compound.

"If we're right…" hypothesis: If we can give transformation owners a credible readiness verdict in under 3 weeks, they will pay for it as the mandatory first gate of any major programme.

Facilitator power questions

  • Whose pain is this, exactly — and would they recognize these words?
  • What does the client do today instead? (The workaround is the real competitor.)
  • Is this a vitamin or a painkiller? If nobody's bleeding, park it.
Handoff to Block 2: carry the problem statement forward. Block 2 must answer: of everyone who has this pain, who feels it most and can act on it?
02
Market Segmentation

Persona & Worldview Mapping

10:35–11:00 · 25 min

Objective

Turn "the client" into a specific, buyable segment — a primary persona with a worldview, plus the buying-centre around them.

Output artifact

One primary persona card + a segmentation grid naming the beachhead segment and why it's first.

Facilitation flow

0–4 min · Inherit
Lead B posts Block 1's problem statement. "Who is the person in this sentence?"
4–12 min · Build the persona
In pairs, fill the persona card. Push past demographics into worldview: what they believe, fear, are measured on, and who they answer to.
12–18 min · Map the buying centre
Around the persona, name the economic buyer, the champion, the blocker, the user. Different pains for each.
18–25 min · Segment & pick the beachhead
Plot candidate segments on the grid (pain intensity × ease of reach). Choose one beachhead and defend it.

Primary persona — "Priya, the Accountable Owner"

AttributeDetail
RoleNewly-appointed COO / Chief Transformation Officer, mid-market firm (£50m–£500m rev), 6 months in seat.
Job-to-be-doneDeliver a board-mandated transformation without becoming the cautionary tale.
Worldview / belief"Consultants sell me confidence I can't verify. I need proof, fast, that I can put in front of a sceptical board."
Measured onProgramme milestones hit, spend vs. business case, retention through change.
FearDiscovering — publicly, late — that the org couldn't absorb what she committed to.
Where she looksPeer CxO networks, a trusted NED, LinkedIn, one or two brand-name advisors.

Buying centre

RoleWhoWhat they care about
Economic buyerCEO / CFOProtecting the transformation investment; downside insurance.
ChampionPriya (COO/CTO)A defensible answer, fast; personal credibility.
BlockerIncumbent Big-4 partnerProtecting the larger bespoke engagement.
UserTransformation PMO leadSomething actionable, not a shelf-ware deck.

Segmentation grid — beachhead decision

SegmentPain intensityEase of reachVerdict
Mid-market, PE-backed, mid-transformationHigh — PE clock is tickingHigh — PE portfolio introsBeachhead
Large enterpriseHighLow — long cycles, incumbentsLater
Public sectorMediumLow — procurement dragPark

Beachhead rationale: PE-backed mid-market firms have an owner with urgency, a value-creation plan with a deadline, and a warm introduction path through the PE sponsor — highest pain, easiest reach.

Facilitator power questions

  • Would Priya pay with her own budget, or does she need the CFO? (Find the money.)
  • What does she believe that makes our pitch land — or bounce?
  • If we can only win one segment this year, is this the one that unlocks the next?
Handoff to Block 3: we now know the buyer, her budget, and her fear. Block 3 packages a product she would sign off — and price.
03
Product Roadmap

Service Productization

11:00–11:20 · 20 min

Objective

Convert a bespoke capability into a product: a named, tiered, priced offer with a fixed scope and a clear "what you get."

Output artifact

A 3-tier product ladder (Good / Better / Best) + a 3-horizon roadmap.

Facilitation flow

0–3 min · Inherit
Lead A restates persona + willingness-to-pay signal from Block 2.
3–11 min · Productize the ladder
Force the bespoke service into 3 fixed tiers. For each: name, scope, deliverable, price band, entry point. Ruthlessly cut anything bespoke.
11–16 min · Define the wedge
Which tier is the low-friction land? Design the "yes" that opens the door to the rest.
16–20 min · Roadmap the horizons
Now / Next / Later — what ships v1, what's fast-follow, what's aspirational.

Rainbow Readiness — product ladder

TierWhat it isDeliverablePrice band
① Pulse
the wedge
2-week diagnostic — fixed scope, 8 dimensions of readiness, benchmarked.Readiness scorecard + red-flag memo + board slide.£15–25k
② RoadmapPulse + a prioritized 90-day gap-closure plan with owners & sequencing.Scorecard + intervention roadmap + exec workshop.£45–75k
③ EmbeddedRoadmap + fractional readiness lead through the first programme gate.Ongoing advisory + quarterly re-score.£20k+/mo

The wedge: Pulse is the low-risk "yes" — small enough for Priya to approve without a CFO fight, fast enough to matter, and it produces the evidence that sells tier 2 and 3. Land with Pulse, expand into Roadmap/Embedded.

Roadmap — three horizons

Now (v1, this quarter)Next (2 quarters)Later (12 mo+)
Pulse tier, hand-run by senior team; standardized scorecard & 8-dimension model.Roadmap tier; partial tooling of the diagnostic; first PE-portfolio rollout.Embedded tier at scale; self-serve intake; benchmark dataset as an asset.

Facilitator power questions

  • What are we refusing to do? A product is defined by its edges.
  • What's the smallest version Priya says yes to on Friday?
  • Where does bespoke sneak back in — and how do we design it out?
Handoff to Block 4: we have a product on paper. Block 4 asks the hard question — can we actually deliver Pulse 50 times a year without it collapsing back into bespoke?
04
Scaling Infrastructure

Operational Readiness & Integration

11:20–11:40 · 20 min

Objective

Stress-test delivery. What has to be true — in people, process, tooling, and economics — for the product to scale without eroding quality or margin?

Output artifact

A readiness heat-map (what's ready / at-risk / missing) + the top 3 things to build first.

Facilitation flow

0–3 min · Inherit
Lead B posts the product ladder. "We just sold 10 Pulses this quarter. What breaks?"
3–12 min · Map the delivery engine
Walk the 4 lanes — Talent, Process, Tooling/Data, Economics. RAG-rate each capability.
12–17 min · Find the constraint
Name the single binding bottleneck to scale. Everything else is secondary.
17–20 min · Build-first shortlist
Pick the 3 investments that move the most red to green.

Rainbow Readiness — operational heat-map

LaneCapability neededStatus
TalentSenior diagnostic leads (scarce, expensive)🔴 At risk — the constraint
Trained analyst pool to run standardized scorecard🟠 Partial
ProcessFixed 2-week delivery playbook, repeatable🟢 Ready (drafted)
Quality gate / peer review to protect brand🟠 Partial
Tooling & DataDiagnostic instrument + auto-scored benchmark🔴 Missing
Client intake & reporting templates🟢 Ready
EconomicsTarget gross margin ≥55% at Pulse price🟠 At risk until leads are leveraged

Binding constraint: senior diagnostic leads. The whole model collapses back to bespoke if every Pulse needs a partner. Scale = leverage.

Build first (top 3)

  1. Productize the instrument — turn the 8-dimension model into a tooled, auto-scored diagnostic so analysts run 80% of it.
  2. Leverage model + academy — 1 lead : 3 analysts; a 2-week certification so the pool scales.
  3. Quality gate — a lightweight peer-review checkpoint that protects the brand as volume rises.

Facilitator power questions

  • What's the one thing that, if it broke, stops everything? Fund that first.
  • Where are we still paying partner rates to do analyst work?
  • At 10× volume, what quietly destroys the margin — or the brand?
Handoff to Block 5: we can now deliver it repeatably. Block 5 lifts the horizon — once this is running and generating data, what could Rainbow become?
05
Future Innovation

Pink Space Ideation

11:40–12:00 · 20 min

Objective

Lift out of delivery mode. Given everything the product generates — data, relationships, reputation — imagine what Rainbow becomes in 3 years. Diverge wide, then place one bet.

Output artifact

3–5 Pink Space concepts + one chosen "horizon bet" with a first experiment.

Facilitation flow

0–3 min · Reframe to abundance
"Constraints off. It's 2029, Rainbow is famous. What is it now?" Every "no, because" is banned; only "yes, and".
3–10 min · Diverge
Provocation cards — What if the data was the product? What if clients ran it themselves? What if it became a standard? Generate wild concepts.
10–15 min · Cluster & sharpen
Group into 3–5 concepts. Give each a headline and a one-line "why it could be huge".
15–20 min · Place one bet
Pick the concept with the best upside × learnability. Define the smallest experiment to test it in 90 days.

Pink Space concepts — Rainbow

ConceptThe ideaWhy it could be huge
The Readiness IndexEvery Pulse feeds an anonymized benchmark. Publish an annual "State of Transformation Readiness" index.Owns the category; each engagement makes the dataset — and the next sale — stronger. Data network effect.
Rainbow-in-a-boxSelf-serve diagnostic PE firms run across a whole portfolio.Recurring, high-margin licence; scales past the talent constraint entirely.
The Readiness StandardRainbow score becomes the covenant lenders/boards require before releasing transformation capital.Embeds us into the deal — a toll on every transformation, not a project.
Predict & preventModel that forecasts programme failure from readiness signals + live delivery data.Moves from diagnosis to insurance — a fundamentally bigger value pool.

Horizon bet: The Readiness Index. It's the flywheel that makes every other concept possible. First 90-day experiment: instrument the next 10 Pulses to a common schema, publish a one-page anonymized benchmark, and test whether "see how you compare" raises Pulse→Roadmap conversion.

Facilitator power questions

  • What by-product of delivery is quietly more valuable than the delivery itself?
  • If a competitor wanted to kill us in 3 years, what would they build?
  • Which bet, if it works, makes the talent constraint irrelevant?
Close the loop: the horizon bet feeds directly back into Block 3's roadmap "Later" column. The workshop ends where it began — with a sharper problem worth solving.

Facilitator prep & materials

🖨 Print the 5 wall canvases⬇ Facilitator deck (PPTX, 9 slides)

2

Facilitators

One leads, one captures & times.

5

Wall canvases

One per block, pre-printed A0.

Visible timer

Blocks are tight — hold time hard.

📌

Carry-forward wall

Each block's headline stays visible.

Pre-reads to send participants

  • This playbook (or a 1-page version) — so no one arrives cold on the flow.
  • 3–5 real client anecdotes / quotes to seed Block 1's empathy work with evidence, not opinion.
  • Any existing win/loss or pipeline data on the candidate segments for Block 2.

Common failure modes to guard against

  • Solutioning in Block 1 — the room jumps to the product before the pain is sharp. Enforce the no-solutions rule.
  • Persona as demographics — "45-year-old exec" tells you nothing. Push for worldview and fear.
  • Bespoke creep in Block 3 — "it depends" is the enemy of a product. Force fixed scope.
  • Optimism in Block 4 — teams love the sale, hate the delivery math. Make someone argue it breaks.
  • Pink Space as roadmap — Block 5 is not "next quarter." If it's fundable now, it's not big enough.